Terminal 18 completed a major expansion in the spring of 2002. T-18 is the Port's largest container terminal and one of the largest in North America. Redevelopment of adjacent property doubled the size of the terminal.

Financing of the $300-million expansion was provided by the sale of special facility bonds backed solely by lease payments. This saved the Port $60 million in capital capacity that can be used to help finance other important projects.

Expansion highlights include:

  • The addition of 90 acres (36 hectares) for a total terminal size of 196 acres (79 hectares)
  • Doubled intermodal container rail capacity - enabling cargo to be moved directly onto railcars for both UPRR and BNSF Railway
  • Improved access to container terminal by rail and road grade separations or route changes

Terminal Size

  • 196 acres (79 hectares)

Berths

  • Number: 3 (4 container berths after construction)
  • Length: 4,440 feet (1,353 meters)

Water Depth

  • -50 feet (-15 meters) for container berths
  • -40 feet (-12 meters) for breakbulk berths

Cranes

  • Seven container-handling cranes
  • One super post-Panamax size
    Lift above rail: 127 feet (39 meters)
    Outreach: 203 feet (62 meters) (22 container-wide vessels)
    Gage: 100 feet (30 meters)
  • Three post-Panamax size
    Lift above rail: 115 feet (35 meters)
    Outreach: 175 feet (53 meters) (18 container-wide vessels)
    Gage: 100 feet (30 meters)
  • Three post-Panamax size
    Lift above rail: 105 feet (32 meters)
    Outreach: 135 feet (41 meters) (14 container-wide vessels)
    Gage: 100 feet (15 meters)

On-Dock Intermodal Yard

  • Loading capacity of 54 five-platform doublestack railcars equivalent of more than 2 full trains for both UPRR and BNSF Railway
  • Adjacent storage facility for 54 five-platform doublestack railcars equivalent of 2 full trains

Refrigerated Capacity

  • 1,227 reefer plugs

Gate

  • In-gate: Fourteen queuing lanes, 12 scales
  • Out-gate: Twelve queuing lanes, 8 scales
  • Eight Reversible

Hours of Operation

  • 0800-1200 and 1300-1630 Mon - Fri

Storage

  • 97,000 square-feet (9,101 square-meters) covered transit shed

Container Equipment Maintenance Facility

  • On-site 30,000 square feet (2,787 sq. meters) facility for container and chassis repair

Additional Features

  • Integrated real-time computer software system for vessel, rail and gate operations to improve decision making for every facet of terminal operations
  • Efficient road access via truck overpass direct into terminal
  • For more information please email terminals@portseattle.org